Case Studies - Introduction

William Martin - Property & Construction Consultants

William Martin have experience of undertaking a wide variety of projects in both the private and public sectors. These range from cyclical repairs and redecoration, through to refurbishment and new build projects to offices, shops, schools, hospitals and private and social housing.

  • Date
    16th November 2021
    William Martin were instructed to design and build a traditional stone building in Mortimers Cross, Hereford.
  • Date
    16th November 2021
    William Martin were instructed to act as Contract Administrator and Project Manager in respect of extension and adaptation works to the property in Warrington to accommodate the client’s disability.
  • Date
    16th November 2021
    William Martin were instructed by the owner to undertake essential repair and redecoration works to the internal and external fabric of this historic building.
  • Date
    6th September 2019
    William Martin were instructed to carry out modifications and adaptations to this traditional character property in Keswick to accommodate the needs of a disabled client. The project involved the internal […]
  • Date
    19th August 2019
    William Martin were instructed by the owners of Wishing Well Farm to carry out modifications and adaptations to the existing farm house to accommodate the needs of a disabled user. […]
  • Date
    28th June 2018
    We were instructed by solicitors to act as Contract Administrator and Project Manager in respect of extension and adaptation works to the property in Dukinfield to accommodate the client’s disability. […]
  • Date
    28th June 2018
    We were instructed by solicitors to act as Contract Administrator and Project Manager in respect of extension and adaptation works to the property in Tadworth to accommodate the client’s disability. […]
  • Date
    28th June 2018
    William Martin designed and developed the planning drawings into full construction drawings to successfully build a new residential dwelling for our client. Our role including producing construction drawing, a specification […]
  • Date
    15th November 2017
    We were instructed by our Client to manage and deliver the internal refurbishment of two floors and the ground floor reception of this building in Farringdon. Complete refurbishment of each […]
  • Date
    15th November 2017
    William Martin were instructed by the Warwick Estates to undertake essential repair and redecoration works to the internal and external fabric of this historic building. William Martin undertook a detailed […]
  • Date
    13th November 2017
    William Martin was commissioned to design, procure and administer the contract for adaptations and extension to a property in Reading following a catastrophic accident suffered by the client. The works […]
  • Date
    13th November 2017
    William Martin was instructed by Skinners Company to undertake all essential works to the fabric of the building and investigate the practicable options of improving accessibility to this building. The […]
  • Date
    13th November 2017
    William Martin are currently working on a three year programme for the external repair of The Royal Herbert Pavilions in Woolwich. This includes joinery, stonework and slate roof repairs. The […]
  • Date
    13th November 2017
    William Martin assisted our client with the acquisition of this Grade II listed property and then provided Building Surveying and Employers Agent services in relation to the substantial restoration and refurbishment […]
  • Date
    13th November 2017
    Bower House is a Palladian mansion built in 1729 to the design of Henry Flitcroft. Originally named Monthavering, the mansion incorporated architectural items salvaged from the ruined Havering Palace, nearby. […]
  • Date
    13th November 2017
    William Martin was initially instructed to provide defect diagnosis for a range of issues such as cracking on the facade and water ingress to the ornate 1930’s property located in […]
  • Date
    13th November 2017
    Save the Children operate a number of retail charity shops throughout the UK. William Martin was appointed to undertake surveys of 80 shop units located throughout the country. Our team […]
  • Date
    13th November 2017
    Temple Grove Academy in Tunbridge Wells opened on January 1st 2013. William Martin initially assisted the Temple Grove Trust in undertaking condition surveys on the fabric as well as the […]
  • Date
    13th November 2017
    Tooting Bec Lido is one of the largest outdoor pools in Europe and in spite of being subject to vandalism and crime, comes alive in good weather. Wandsworth Borough Council, […]
  • Date
    13th November 2017
    Tooting & Mitcham United FC (TMUFC) occupied a dilapidated ground at Sandy Lane in Tooting which is in a residential area. Cranbrone Developments approached TMUFC with a proposal to build […]
  • Date
    13th November 2017
    Jointly funded by the Lawn Tennis Association and the government via its New Initiative Fund, William Martin was appointed as project managers to the employer, the London Borough of Bromley […]
  • Date
    13th November 2017
    William Martin was instructed by the landed estate freeholder as designers and contract administrators for the external repairs and redecorations. This property comprised of 62 flats and 7 high end […]
  • Date
    13th November 2017
    William Martin undertook the Project Monitoring role for this new affordable housing development of 14 shared ownership units developed by Circle Anglia Housing Association in Freemasons Road, Custom House, in […]
  • Date
    13th November 2017
    William Martin helped Spitalfields Housing Association to manage their ‘Decent Homes’ programme. Part of this commission involved undertaking a Stock Condition survey, to survey a representative sample of the Association’s […]
  • Date
    13th November 2017
    William Martin was appointed to carry out defect diagnosis, produce a 10 year planned maintenance programme for capital expenditure budgeting, design and contract administer the external refurbishment of this prestigous […]
  • Date
    13th November 2017
    External refurbishment of a Victorian mansion block in Earl’s Court. The works were prompted by the fall of a large piece of masonry from one of the stone balcony brackets […]
  • Date
    13th November 2017
    Wandsworth Recovery Centre was originally constructed under Procure 21. William Martin’s role is to undertake a £2.5 million project to build an extension to the Psychiatric Intensive Care unit, and […]
  • Date
    13th November 2017
    William Martin won a place on the Framework Panel for quantity surveyors & CDM for the University College London Hospital NHS Foundation Trust in early 2010. Projects included: Fitting out […]
  • Date
    13th November 2017
    William Martin have acted as designers and contract administrators for the refurbishment of the Shaftesbury Clinic at Springfield Hospital. This has included complete renewal of the finishes and furnishes within […]
  • Date
    13th November 2017
    William Martin Property Consultants Ltd has acted as designer, contract administrator and CDMC for the alterations and refurbishment of Rowan & Sycamore Wards at Springfield University Hospital. This included the […]
  • Date
    13th November 2017
    William Martin acted as CDM Co-ordinators for this project as part of their framework for the Homerton University Hospital NHS Foundation Trust. The project comprised the refurbishment of a surgical […]
  • Date
    13th November 2017
    Queen Elizabeth’s Foundation encourages and enbales adults with disabilities to increase independence and improve life skills. The Foundation’s aim is to ensure that all adults in the United Kingdom with […]
  • Date
    13th November 2017
    William Martin are acting as CDM Coordinators on this £4.5m project to expand St Mary’s & St Peter’s Primary School from two to three forms of entry. The aims of […]
  • Date
    13th November 2017
    William Martin were appointed by the London Borough of Southwark to design a new covered Multi Use Games Area at the Charter School, complete with floodlighting and a new all […]
  • Date
    13th November 2017
    William Martin was appointed to undertake a stock condition survey of 45 Primary Schools in Sheffield (108,000 m2 GIA) using The Technology Forge TF Condition system. This is a web […]
  • Date
    13th November 2017
    School meals are a very topical issue. At Sellincourt school in Wandsworth, William Martin provided a full multi-disciplinary design service to form a new kitchen and dining room block. This […]
  • Date
    13th November 2017
    Work is has recently been completed on a £1.5m project to convert a four storey block at Phoenix school to a new ICT facility. The challenge presented by Hammersmith’s brief […]
  • Date
    13th November 2017
    William Martin was appointed various to undertake stock condition and compliance surveys of Primary and Secondary schools for the London Borough of Islington. Mobilising a team of Engineers and Surveyors […]
  • Date
    13th November 2017
    This project involved reduction and relocation of the existing kitchen plus repositioning of the main entrance and offices in order to give the school a central hall. The hall has […]
  • Date
    13th November 2017
    William Martin was commissioned to undertake a Feasibility Study for the expansion of this successful primary school in the northern part of Westminster. The school is a typical Victorian “triple-decker” […]